Past Projects

 

We take pride in our work and in a job well done.  We preform every thing we do with skill, attention to detail, customer satisfaction and craftsmanship at the forefront.


Lee Co Annex CCTV/ Opelika, AL 2018 
Carmon Construction (Prime) - Responsible for installation of new CCTV system.

 
Merrimack - McKenna, NH / Montgomery, AL 2017 
Cornerstone (Prime) - Responsible for installation of new CCTV and Access Controls system.

 
Santa Rosa, FL Actall System / Milton, FL 2017 
Cornerstone (Prime)  - Responsible for the installation of 68 Actall units and new PCs.

 
Holman—Kilby CF Dorm Exit Lock Replacements  / Atmore & Montgomery, AL 2017 
AL Department of Corrections (Prime) - Responsible for removing and replacing detention locks in two facilities.

 
Lee Co Jail rooftop conduit relocation / Opelika, AL 2017 
DPS Group (Prime) - Responsible for relocation of rooftop conduits to the exterior walls of inmate housing units.

 
Ft Gillam Locker Controls / Ft Gillam, GA 2017 
DESI (Prime) - Responsible for installation security controls and backbone in evidence lockers.

 
Lee County Fiber / Opelika, AL 2017 
DPS Group (Prime) Responsible for installation and termination of fiber backbone for the Lee County Courthouse.

 
Montgomery Stockyard Camera Addition / Montgomery, AL 2017 
DPS Group (Prime)  
Responsible for the  design and installation of camera system.
 
New River Facility / Raiford, FL 2017
Cornerstone (Prime)  Responsible for the installation of an Actall duress system.


Lee County Recycling Center / Opelika, AL 2017 
DPS Group (Prime) - Responsible for the installation of new camera system.

 
Barbour County Jail / Clayton, AL 2017 
Cornerstone (Prime) - Responsible for installation of new CCTV system and repairs to door control system.

 
State of Alabama Library Systems Security Upgrades / Montgomery, AL 2016 
Johnson Controls (Prime) - Responsible for installation of new CCTV and Access Controls system.

 
Escambia Country Jail / Pensacola, FL 2016 
Birkshire Johnstone (Prime)  - Responsible for the installation of detention doors and locks as well as upgrades to door control system.

 
Lee Country Courthouse Cameras / Opelika, AL 2016 
DPS Group (Prime) - Responsible for the installation of new CCTV system.

 
Houston County Jail / Dothan, AL 2016 
Steward Construction (Prime) - Responsible for design and installation of new PLC Door Control system and new CCTV system.

 
Peyton Cook PLC Upgrades / Milledgeville, GA 2016 
GC&E (Prime) - Responsible for upgrades to CCTV system.

 
Lee County Panic Devices / Opelika, AL  2015  
DPS Group (Prime)  Responsible for upgrades to Access Controls system.

 
Windcreek Tallapoosa Casino / Montgomery, AL 2015
Johnson Controls (Prime) Responsible for installation of HVAC controls.


AL Dept. of Corrections Women’s Work Release Camera Addition / Birmingham & Mt. Meigs 2015 
Johnson Controls (Prime) - Responsible for installation of new camera system, power upgrades and fiber backbone at three facilities.

 
Air National Guard Building 1108 / Montgomery, AL 2014 
Johnson Controls (Prime) - 
Responsible for the HVAC conduit and control wiring.
 
Lee County Justice Center Slider Replacement / Opelika, AL 2014  
DPS Group (Prime)  Responsible for the replacement of detention sliders, control and hardware.

 
Franklin County Detention Center / Lewisburg, NC 2014 
Watson Electric (Prime)  Responsible for Security Electronics Division 17000; camera systems, card access, intercom and paging systems, door control systems.

 
Cornerstone Montgomery Office for Norment Security Group / Montgomery, AL 2014 
Cornerstone (Prime)   Responsible for Division 16000 renovation of office and manufacturing facility.  Installation of power and distribution, lighting, tele/data and fiber backbone.

 
County Wide Card Access Renovation & System Networking / Opelika, AL 2014 
DPS Group (Prime)  Responsible for the installation and implementation of county wide card access system across multiple locations.

 
Wyoming Boys School Phase II / Worland, WY 2014 
CML/RW (Prime)  Responsible for camera system, structured cabling and fiber terminations for renovation of juvenile facility.

 
Montgomery County Youth Facility /  Montgomery, AL 2014 
Bear Brothers Construction (Prime) Responsible for Security Electronics Division 17000; camera systems, card access, intercom and paging systems, tele/data, fiber backbone and door control systems.

 
Bill E. Ireland Youth Detention Facility / Milledgeville, GA 2014 
Responsible for the door control system and intercom paging systems replacement.


Montgomery City Jail Renovation / Montgomery, AL 2013 
DPS Group (Prime)  
Responsible for the replacement of detention glazing and replacement of detention locks.
 
Mt. Olive Correctional Complex / Mt Olive, WV 2013 
Norment Security Group (Prime)  Responsible for Division 17000 security electronics; card access, camera systems, intercom and door control systems. 

 
Morgan Country Judicial Center / West Liberty, KY 2013 
US Security Systems (Prime)  Responsible for Division 11000 Detention Equipment; detention doors, detention glazing, locks and hardware.

 
Oakley, MS 2013 
Norment Security Group (Prime) Responsible for Division 17000 security electronics; touch screen system expansion, integration to existing door control system and reprogramming of existing system.

 
RSW Regional Jail / Front Royal, VA 2013 
Norment Security Group (Prime) Responsible for Division 1700 security electronics; door control systems, camera systems, card access and intercom systems.

 
Jackson Medgar Wiley Evers International Airport / Jackson, MS 2013 
EO Integrated Systems (Prime).  Responsible for Division 17000 Security Electronics; camera systems, card access systems, door control systems and intercom.

 
Escambia County Booking and Detention Facility / Pensacola, FL 2013 
US Security Systems (Prime)  Responsible for the replacement of detention sliders, control and hardware.

 
Bibb County Juvenile Justice Center / Macon, GA 2014 
US Security Systems (Prime) Responsible for detention door, locks, detention furniture, security glazing and hardware.

 
Fountain Correctional Facility/ Atmore, AL  2013  
Limestone Building Group (Prime) Responsible for Division 17000 security electronics; relay logic control system of perimeter gates. 

 
GA Diagnostic Center/ Jackson, GA  2013
US Security Systems (Prime) Responsible for Division 17000 security electronics; Touchscreen, PLC, and door control systems. 


Mt Brook Municipal Police Department / Mt. Brook, AL 2013 
Brasfield & Gorrie (Prime) US Security Systems (DEC) Responsible for the installation of all Division 11000 Detention Equipment including doors, locks, & hardware.

 
HVAC Controls at Draper and Staton Corrections Facilities / Elmore, AL 2012  
Johnson Controls (Prime) Responsible for the installation of all HVAC controls throughout both facilities as part of energy efficiency upgrades.

 
Montgomery City Hall Renovation / Montgomery, AL  2012 
Construction One (Prime) Responsible for Division 17000 security electronics; card access, camera systems and door control systems. 

 
ADYS Mt. Meigs / Mt. Meigs, AL 2012 
Pemberton (Prime) Responsible for Division 17000 security electronics; Touchscreen, PLC, card access, camera systems and door control systems.  Manufacturer’s used: Allen Bradley, Pelco.

 
TK Davis Justice Center Intercom System/ Opelika, AL  2011  
DPS Group, LLC (Prime) Responsible for Division 17000 security electronics; PLC, touchscreen, intercom/ paging. 

 
Richmond ICE / Richmond, VA 2011
The G-S Company (Prime) Responsible for Division 17000 security electronics; replay logic door control systems. 

 
TK Davis Justice Center Door Control System / Opelika, AL  2011 
DPS Group, LLC (Prime) Responsible for Division 17000 security electronics; Touchscreen, PLC,  and door control systems. 

 
Creek Casino / Tallapoosa, AL (New Construction) 2011 
Johnson Controls (Prime) Responsible for the installation of all HVAC controls throughout facility.

 
North Carolina Central Prison Kitchen Addition / Raleigh, NC (New Construction) 2012
EO Integrated Systems (Prime) Responsible for the installation of all Division 17000 security electronics systems; cameras, card access, intercom/ paging, door controls.
 
Wetumpka Women’s Facility / Wetumpka, AL (Renovation) 2011 
Responsible for installation of detention equipment and detention gate operator as part of facility remodel.

 
FCI Hazelton / Brucemills, WV (New Construction) 2011/2012 
Responsible for installation, termination, testing, and certification of all telecommunications and fiber. Approximately 2700 CAT6 Drops and 6200 fiber strands.


Lee County Jail I Opelika, AL (Renovation) 2011
Responsible for installation of door control system on additional doors in county detention facility.

 
Central State Prison I Raleigh, NC (New Construction) 2011
Responsible for the installation of all security electronics equipment including camera and card access systems at a 5 story twin tower detention hospital.

 
San Bernardino Police I San Bernardino, CA (New Construction) 2011
Responsible for installation of Division 17000 security electronics equipment; camera systems, card access and door control system.

 
FCI Mendota I Mendota, CA (New Construction)2011
Responsible for installation of Division 1700  including card access, camera system and full fiber infrastructure.

 
Crockett State Juvenile I Crockett, TX ( Renovation) 2010 
Responsible for installation of detention equipment and detention glass in facility addition.

 
Evins Juvenile Detention Center I Edinburg, TX (Renovation)2010
Responsible for installation of detention equipment and detention glass in facility addition.

 
Riley County Law Enforcement Center I Riley, KS (New Construction) 2010
Responsible  for installation of Division 1700 security electronics; card access, camera systems and door control systems.

 
Girls Treatment Center I Tuscaloosa, AL (Renovation) 2010
Responsible for the installation of all detention equipment; doors, locks, detention furniture, and security electronics equipment; card access, door control system, cameras and intercoms at Youth Services Facility.

 
Martha Glaze RYDC I Hampton, GA ( New Construction) 2010
Responsible for installation of detention equipment; doors, locks, and detention glass.

 
Maxwell AFB Access Control Points I Montgomery, AL (New Construction) 2010 
Responsible for the Electrical infrastructure of final denial barrier system including all fiber installation and termination.

 
Bertie Correctional I Bertie, NC (New Construction) 2010 
Supervised the installation of all detention equipment and provided technical support to the State of North Carolina Department of Corrections on an inmate performed construction project.

 
US Federal Courthouse / EI Paso, TX (New Construction) 2009 
Responsible for the installation of the Security Electronics, Detention Equipment including stainless steel cell fronts and furniture and Security Ceiling in holding cells throughout 8 story Federal Courthouse facility.

Tutwiler Correctional / Wetumpka, AL (Renovation) 2009 
Responsible for the installation of all Division 11000 Detention Equipment including doors, locks, & hardware.
 
Sarasota County Jail / Sarasota, FL (New Construction) 2009 
Responsible for the installation of all Division 11000 Detention Equipment including doors, sliders, locks, hardware, detention furniture and security ceiling.
 
Rowan County Justice Center / Rowan, NC (New Construction) 2009 
Responsible for the installation of all Division 11000 Detention Equipment including doors, sliders,
locks, hardware, detention furniture and security ceiling.

 
Beaumont Federal Prison / Beaumont, TX (New Construction) 2009 
Responsible for the installation of access controls for perimeter fence and access gates.
 
Estill Federal Prison / Estill, SC (New Construction) 2009 
Responsible for the installation of access controls for perimeter fence and access gates.
 
Montgomery County Jail/Troy, NC (New Construction) 2009 
Responsible for the installation of Security Electronics System including access controls, door control systems, lighting control systems, camera systems, video visitation, card access, and intercom
systems.

 
St. Lucie County Clerk of the Court / Ft. Pierce, FL (New Construction) 2009 
Responsible for the installation of Division 11000 Detention Equipment including doors, door
hardware and locks and Division 17000 Security Electronics door control systems.

 
Terre Haute Federal Prison / Terre Haute, IN (Renovation) 2009 
Responsible for the replacement and termination of defective conductor to lethal/non-lethal perimeter fence system.
 
St Clair Youth Detention Facility / Springville, AL ( New Construction) 2009
Responsible for the installation of all Division 11000 Detention Equipment including doors, door hardware, locks and detention furniture.
 
Illinois State Prison / Thomson, IL (New Construction) 2009
Responsible for the installation of Division 17000 Security Electronics camera systems.
 
Laredo INS Center / Laredo, TX (New Construction) 2009 
Responsible for the installation of all Division 11000 Detention Equipment including doors, door hardware, locks and detention glazing.
 
Craig County Juvenile Detention Center / Vinita, OK (New Construction) 2009
Responsible for the installation of all Division 11000 Detention Equipment including doors, door hardware, locks, detention glazing and detention furniture. Responsible for the installation of all Security Electronics Systems including fire alarm system, door controls, camera systems, and paging system.
 
TK Davis Justice Center / Opelika, AL (Renovation) 2008 
Responsible for the installation of expanded telecommunications and datacom network for Lee County.
 
TK Davis Family Court Renovation / Opelika, AL (Renovation) 2008
Responsible for the installation of all Division 16000 Electrical System and Fire Alarm System, Division 11000 Detention and Division 13000 Security Electronics.
 
Rockdale County Jail / Conyers, GA (New Construction) 2008
Responsible for the installation of security glazing, security frames, security doors, security hardware and furniture, commercial hardware and exercise yard mesh.
 
Foley Police Station / Foley, AL ( Renovation) 2008 
Responsible for installation of security doors, hardware and electronics for security door controls.
 
Horry County Jail / Conway, SC (New Construction) 2008
Responsible for installation of Exercise Yard Mesh.
 
Atlanta Medical Center ( Phase 2) / Atlanta, GA (New Construction) 2008
Responsible for installation of woven mesh security screens on Detention Wing of hospital.
 
Macon State Prison / Oglethorpe, GA ( New Construction) 2008 
Responsible for the installation of security glazing, security frames, security doors, security hardware and furniture.
 
Dooly State Prison / Unadilla, GA (New Construction) 2008 
Responsible for the installation of security glazing, security frames, security doors, security hardware and furniture, commercial hardware and exercise yard mesh.
 
Brantley County Jail / Nahunta, GA (New Construction) 2008 
Responsible for the installation of security glazing, security frames, security doors, and security
hardware.
 
Dallas County Juvenile Detention Facility Phase 1 & 2 / Selma, AL (New Construction) 2008
Responsible for the installation of all Division 16000 Electrical System and Fire Alarm System
 
Ft. Taylor Hardin / Montgomery, AL (Renovation) 2007 
Responsible for the installation of Front Gate controls and card access system for the Alabama
National Guard.
 
Ft. George Wallace / Montgomery, AL (Renovation) 2007 
Responsible for installation of Card Access System for Alabama National Guard.
 
Birmingham Air National Guard / Birmingham, AL (New Construction) 2007 
Installation of electrical for telecommunications room & Division 16000
 
Birmingham Airport / Birmingham, AL (New Construction) 2007
Installation of a beacon tower at the Birmingham Airport for the Alabama Air National Guard.
 
Atlanta Medical Center (Phase 1) / Atlanta, GA (Renovation) 2007 
Responsible for installation of woven mesh security screens on Detention Wing of hospital.
 
George Allen Courts Building / Dallas, TX (Renovation) 2007 
Responsible for the installation of CCTV, Card Access, Court Sound, Paging, and Intercom
System.
 
Flagler County Court Building / Bunnell, FL (New Construction) 2007 
Responsible for the installation of CCTV, Card Access, Court Sound, Paging, and Intercom
System.
 
TK Davis (Lee County Jail) Expansion / Opelika, AL (New Construction) 2007
Responsible for the installation of Door Control System, Card Access System, Intercom and Paging Systems, CCTV System and Tele/Data Network Cabling System.

 
Harlan County Jail / Harlan, KY (New Construction) 2007 
Responsible for the installation of Door Control System, Card Access System, Intercom and Paging Systems and CCTV System.
 
Oliver Elementary School Addition / Seale, AL (Renovation) 2007 
Responsible for the installation of all Division 16000 Electrical System
 
Houston County Court Upgrades / Perry, GA (Renovation) 2007 
Responsible for the installation of additional devices and cabling for the Card Access System,
Intercom and Paging System and CCTV System.

 
Flagler County EOC / Bunnel, FL (New Construction) 2006 
Responsible for the installation of Card Access System, Intercom Paging System and CCTV System.
 
State of New Mexico Penitentiary Emergency Upgrades / Santa Fe, Los Lunas, and Las Cruces,
NM (Renovation) 2006 

Responsible for the installation of Door Control System.
 
Alterations and Additions to Valley Armory / Valley AL (Renovation) 2006 
Responsible for the installation of all Division 16000 Electrical System.
 
Hope House / Oneonta, AL (Renovation) 2005 
Responsible for the installation of all Division 16000 Electrical System.
 
Snead State Community College Annex / Oneonta, AL (Renovation) 2005 
Responsible for the installation of all Division 16000 Electrical System
 
Savannah Regional Juvenile Facility / Savannah / GA (Addition) 2005 
Responsible for the installation of security glazing, security doors, and security hardware. 100 bed unit.
 
College Park Police Station / College Park, GA (New Construction) 2005 
Responsible for the installation of security glazing, security doors, and security hardware. 30 bed unit.
 
George Allen Court Building / Dallas, TX (Addition / Renovation) 2005 
Responsible for the installation of CCTV, Card Access, Court Sound, Paging, and Intercom System.
 
Childersburg Comm. College Wellness Center / Childersburg, AL (Renovation) 2004 
Responsible for the installation of all Division 16000 Electrical System and Fire Alarm System.
 
Heard County Jail / Walker, GA (New Construction) 2004 
Responsible for the installation of security glazing, security doors, and security hardware. 150 bed unit.
 
Montgomery Federal Courthouse I Montgomery, AL (Renovation) 2004 
Responsible for the installation of Stainless Steel Benches, Cell Fronts, and Elevator Partitions.
 
First Methodist Church I Tallassee, AL (Renovation) 2004 
Responsible for the installation of all Division 16000 Electrical System and Fire Alarm System.
 
Wyoming Women’s Prison I Lusk, WY (Renovation) 2004 
Responsible for the installation of Electronics upgrade to existing CCTV, Door Control, Paging,
Intercom, and Fire Alarm System. 300 bed unit.